ELECTRICAL CONSTRUCTION SCHEDULER (Unionville, CT) HOT JOB
Delta Construction Partners is a National Executive Search and Management Consulting Firm for the Nations premier General and Electrical Contractors and Industry professionals. Delta has been retained to conduct a search to fillthe above position for a confidential client in their Unionville, Connecticut office.



Requirements:

Must have at least 2 years of experience related to project controls & reporting activities supporting construction projects
Must have experience with project change management, cost control, progress measurement, schedule development and schedule control
Review contractor's baseline schedule submissions and provide narrative
Perform QA/QC on contractor schedule submittals for conformance with contract
Perform Critical Path analysis and Earned Value analysis
Walk the field, and perform weekly and monthly schedule progress and provide reports to the project OAR and upper management
Ability to read drawings, determine if work is in or out of scope and understand terms and conditions of the contract to determine compensability, as well as concurrent delays
Effectively communicate with the contractor
Review, evaluate and reject or approve contractor recovery schedules
Perform program schedule QA/QC review and updates
Experience with Primavera 6.0 preferred
Demonstrated experience scheduling the design and construction of large-scale, complex projects
Microsoft Office Suite of software is required
Experience with Adobe Acrobat and/or Bluebeam is required
Vocational certificate or two-year degree in Engineering, or related field experience required.


Experience with Utility work is preferred
Experience with electrical commercial construction/installation is a plus


EDUCATION:

College degree preferred, but not mandatory

COMPENSATION:
A strong total compensation package will be offered; however, details will only be disclosed during the interview process.


Best Regards,

Barbara Montgomery, VP, Senior Recruiter
Delta Construction Partners, Inc.
360 Central Ave. Suite 400
St.

Petersburg, FL 33701
Wk:
(727) ###-####
Fax: (727) ###-####
Associated topics: design, develop, electric, electrical, electrical engineer, electronic, engineer, plc, power, systems

contact seller Read More

Copyright © 2018 Americanlisted.com, All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.